How can you move QI Stock from a Sloc to SLoc in the same plant w/o performing Inspection.

darrinhayes-1
Discoverer
0 Kudos

I was wondering if it was possible to move QI Stock from Storage Loc to another Storage Loc in the same plant? We need to Inspection Material as it arrives to our Production facility but, first it has to go through a Warehouse before sending it to the final Production Plant. Both the Warehouse and and Manufacturing plaint share the same plant code. Is it possible to bypass Inspection at the warehouse before going to the production Facility? Or is is possible to transfer the QI stock without performing Inspection Lot at the Warehouse? The other problem is we inspect differently at both locations. The Warehouse is just a simple visual inspection but the Manufacturing Plant is a more detailed inspection. There will have to be 2 different plans, therefore, causing issue with auto release of the Inspection Lot since the Material is on 2 different plans with in the same plant code.

View Entire Topic
nihal_nayak
Participant
0 Kudos

It is possible to skip inspection at the receiving warehouse via user exit. There is no other standard solution available for this.

Later when tou transfer the materials from warehouse sloc to production sloc, you can teigger a 08 inspection.