cancel
Showing results for 
Search instead for 
Did you mean: 
Read only

In material inspection, no inspection lot can be created for material with batch management

dussaxi
Explorer
0 Likes
436

A customer return with batch managed material is received and a split is done on goods receipt booking. Now we have a inspection in MSR_INSPWH with two items (900001 and 900002), but now inspection lot can be created for either of this positions.

 

Accepted Solutions (0)

Answers (1)

Answers (1)

Lakshmipathi
SAP Champion
SAP Champion
0 Likes

Check SAP notes 1837582 and 2781570