When doing backflushing for components, by co11n, system is not proposing

batch automatically. What configuration I need to . Pl help. Very urgent.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

if you have maintained batch search proceducre in t/c OPLG and that procedure is assigned to production order type OPL8.

In T/C OPJ2 for plant/order type/ operation 3 you activate the BD

Regards and expects rewards if its useful

Rajasekaran.

Answers (3)

Answers (3)

Former Member
0 Kudos

hi

if u want batch determination for finish material

u have to make setting like

go to spro

Logistic general

1)batch management-specify batchlevel and activatestus mangment

2)batch number assignemnt-activate batch number assignment

3)maintain number rang4)activate batch number indiactor for finish material in work scheduling view of materail master

if doubt pls reply me if helpful pls reward points

former_member196398
Active Contributor
0 Kudos

Bakyaraj,

In transaction "OPJ2" for plant/order type/ operation "3" you need to <b>activate</b> the <b>"BD".

My assumption is that you have maintained batch search proceducre control in transaction "OPLG" and that procedure is assigned to the production order type / plant combination in "OPL8".

Hope this helps....Reward your points and close the thread,

Regards,

Prasobh

Former Member
0 Kudos

Bakyaraj,

Have you done the barch determination in prod order ? IF so the batch will come in co11n.

If no you can trigger the batch determination from co11n. try the menu options.

Rgds

Ram