kiran_kumar179
Active Contributor
Member since ‎2008 Jul 28

User Statistics

  • 2,240 Posts
  • 244 Solutions
  • 0 Kudos given
  • 13 Kudos received

User Activity

  The new SAP implementations or migrations are on SAP S4 HANA 1610 and higher versions. When we upgrade or migrate from SAP ECC 6.X to S4 HANA we need to take into consideration some of the perquisites, which SAP has published in the Simplification...
Hi,During CM25 dispatching can I control dispatching of any operation if its predecessor or/and successor operation do not find any available capacity.Say I have 2 operations with different work centers, Now in CM25 during dispatch if 2nd operation W...
Hi,I have one question regarding CRP for one WC as per CM01 and CM07 the requirement from one production order is 8.498 hrs on particular week which is correct if I check the order operation times.But for same order if I check in CO01 capacity check ...
Hi We have a requirement to have print KANBAN production orders to default printers based on MRP controllers and Standard production orders defaulted to print based on user default printer which is in user profile, for both orders we have same order ...
Hi,I understand the logic behind the calculation of stock Days supply and 1st and 2nd RD supply,In 1st RD supply calculation some times system is not considering the PO and showing same value in both DS and 1st and 2nd RS.As per our configuration it ...