Hi,
In SAP WM. How do we make sure that the system proposes the bin which is closer to the bin where the stock was last placed during put away.
Is it possible through configuration or enhancement?
Thanks,
Sandeep Kumar
Hi,
When I'm doing the GR for a purchase order, the transfer order is created for all the line items. The line items can be of multiple storage locations. Instead of creating one TO, I want to create multiple TOs based on the storage locations.
...
Hi all,
I have a scenario in which, when I do the MIGO, the stock is moved to Quality inspection and after USER DECISION, a TO is created from storage type 922 to ST1 with BIN proposal. The movement type of the TO created is 321.
When I'm trying...
Hi,
I have a situation where I have to upload a characteristic value (ATWRT) which is empty/space. But it has a characteristic description.
When I'm uploading it I don't get any error, but i don't see the value uploaded.
That particular charact...
Hi,
For one of our programs, we are hitting BSEG table with ZUONR value and BSCHL as '01' values.
The program is taking too long just of this query and causing performance issue.
Is there any alternative through which we can achieve better perf...
In OMLX it is configured as Storage Bin can be changed.
Note: the issue is not during normal TO creation. It is only for posting change after Quality inspection.
Hi DB49,Yeah, entire Sales line item is sent to ATP at once, but as only 2 of them are confirmed and not the other schedule line, that is causing the confusion to the users.When we do an ATP later, it is confirming all the sch lines at once as it sho...
Hi DB49,Okay, So does that mean, when we split the line item and press enter, the system does availability check but it doesn't ask for a user to accept the proposal? But shouldn't that also confirm for the first scheduled line as well?Actually the m...
Hi Lakshmipathi,It is happening across the plants and materials.When ever the user is splitting the schedule line, this happens.Thank you,Sandeep Kumar S