cancel
Showing results for 
Search instead for 
Did you mean: 

lo cock-pit

Former Member
0 Kudos
67

hiiii Experts

1)My LO extraction(lo-cock pit) is running in production side,but i have to make some changes in development side Lo,what are the precautions i have to talk in production side.

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

hiiiiiiiii experts

Thanx 2 all.

former_member181964
Active Contributor
0 Kudos

Hi,

My LO extraction(lo-cock pit) is running in production side,but i have to make some changes in development side Lo,what are the precautions i have to talk in production side.

You do all changes in Dev and then test and Transport the objects till Qty and from QTY to PROD you floow the below steps.

If your datasource is already in production, and you want to data only from today onwards for enhanced fields, i.e. historical data is not required for enhanced fields..

1. Fix ECC down time for 20 to 30 munities

2. Keep all objects on Qty system in ECC and BW.

3. Run Delta laods in BW for 2 to 3 times.So with this step you can clear SMQ1 and RSA7. Check the entries in RSA7, if it is ZERO then it is fine.

4. Move DS from ECC Qty to ECC PROD .

5. Replicate in BW.

6. Move all BW objects from BW Qty to BW Prod.

7. Delete Init load in InfoPackage level (Not in ODS/Cube).

8. Load Init without DataTransfer.

9. Then Run Delta.

10.Next day on wards deltas will come as usual.

If you need Historical data also.

1. Delete data in Cube.

2. Fix Down Time and load Init then Delta.

See the thread in SDN

Thanks

Surendra Reddy

former_member188011
Active Contributor
0 Kudos

Hi Arvind:

Please refer to the blog "Customizing Cockpit: Managing delta queues when structure changes" by J Francisco Fernandes.

/people/jfrancisco.fernandes/blog/2010/05/21/customizing-cockpit-managing-delta-queues-when-structure-changes

Regards,

Francisco Milán.

Former Member
0 Kudos

Hi Arvind ,

You can do changes or developments in the dev box and move that request to Test Box and after that while moving to prod box you should have to specify the downtime (10 min ...) and move that request. Before moving to production load all the delta records to BW.

Hope this will help you,

Manohar.