Hello Everyone,
I have a requirement where the client forecasts finished materials using Planned Independent Requirements. The user inputs the requirements on a weekly basis and specifies a production version for each line. Since each requirement has a different production version, the user wants to generate a single planned order for each matching production version during the MRP run, in order to optimize the capacity of the reactor.
Is there a way to combine planned orders for the same production version? I attempted to use a monthly lot size, but it resulted in a single planned order with version 001.
Regards
Tejas