on 02-10-2010 5:44 PM
Hi Guru's,
I wish to publish the forecast from APO SNP to R/3 - is this possible?
I have maintained a distribution definition for planned independent requirements and created and opened the CIF between R/3 and APO.
I can release from directly from DP to R/3 therefore the main settings are in place. Are there further settings required to CIF data from SNP to R/3?
Thanks
Hi,
Can you please elaborate the scenario where you required to send APO SNP Forecast to R/3.As you already configured the set ups for DP to R/3 Forecast CIF. And Forecast at SNP we can get from DP or other non-SAP system so if you are using DP then the forecast at SNP and R/3 will be same.
Please provide some more detail on this.
Thanks,
Dipankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Dipankar,
We want to have forecast in SNP and R/3 because we wish to do mid term planning in SNP and short term planning in R/3 PP.
We are looking to move to PP/DS later.
For our APO project we require stock transfer orders to consume forecast and we have completed this work within SNP. In order to prevent re-doing the consumption work in R/3 we wish to interface the consumed forecast to R/3 so it can be used in calculations there.
Furthermore, we want to avoid data inconsistencies by releasing to both systems and then doing consumption in 2 systems - which will ineveitably give different results between the systems
Thanks