Dear Gurus,
Our business requirement is as follow:
Suppose MM has received 10 consignment of a material (Goods receipt) against a material in month of Feb-2008 from a particular vendor.
Inspection lot statistics in MCXA is updated on the basis of inspection lot generation, which is as per our requirement.
Suppose this inspection take 2 days for analysis at laboratory.
Now FI has to make payments for the month of Feb-2008 against this inspection results. They need the value of average quality parameter for the month of Feb-2008. (Average value of all quality parameter for the material of all the inspection lot which are generated in Feb-2008)
I want that QMIS should update on the basis of Inspection Lot creation date not on the basis of result recording system date.
I think there should be some configuration settings available for this purpose.
Please help me out.
Regards
Honyal
Ok Thank you
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Any valuable input are welcome
regards
Honyal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
8 | |
8 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.