Restricting period in profitability realignment run

Expert
Active Contributor
0 Kudos

We are running a profitability analysis realignment (app "run realignment, profitability analysis) and with these 2 cases: 

1. Changing a product master data characteristic and running the realignment afterwards.

2. Not changing the product MD itself but giving a specific value in input during realignment. 

I would like to know if the realignment can be limited to a specific period of time? in the selection parameters I only see fiscal year as possible select or posting date, but I do not see how to limit the change to a specific month (for example). 

Accepted Solutions (1)

Accepted Solutions (1)

Expert
Active Contributor
0 Kudos

There are a few date for Profitability Realignment.

1. Fiscal year

2. Posting Data

3. Realignment Data

based on that, there is result based on different Realignment year/month.

you might want to check the attached sample result list.

Answers (0)