Hi,
we have the requirement to replace our existing boms with plant assignment with 'client boms' that have no plant assignment and are valid for all plants. I never did that before and I would be glad if somebody could share his experience if he/she ever did a migration like that.
Kind Regards
Nicola
Dear,
You can create Group BOM for the materials required ,in CS01 don't give plant and this will be available in client level.
Use LSMW to create this and in LSMW don't give plant field.
Thanks,
Naresh.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
My suggestion is down load the existing BOMs with the same template (using creating the download program or from tables ) which you are using for the migration program and Migrate as group BOM in this way we can eliminate human errors.
after creating group BOM you can MAP using CS07 (you can create LSMW or custom program for this)
Thanks,
Naresh.
Hi Nicola
Please try/check with LSMW Standard Batch/Direct Input.
Object : 0030
Method : 0001
Program Name : RCSBI010
Program Type : B
To create LSMW with above object, Please go through the below link for the guidance.
http://scn.sap.com/docs/DOC-45119
Regards
Suresh.M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
8 | |
6 | |
5 | |
5 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.