CK13N not matching with value calculated manually.

CA_Ram
Participant
0 Kudos
757

Hi Experts,

Please go through to the below scenario and help.

Cost estimate details:


Costed on 15.01.2015

Marked : 20.01.2015

Released ; 20.01.2015

UOM : KM (10 RL=35KM)

Valuation type  : Legal and group

Currency : GBP (Controlling currency) and KRW (Local Currency)

PIR details :


On 15.01.2015, PIR was initially created with currency MYR with no condition. On 20.01.2015 PIR updated with condition and currency USD.

UOM – RL

Material master Details :


UOM : RL

Currency – KRW (local currency)

Controlling details :


Exchange rate type: P

Currency – GBP

OKYD and OKEQN is maintained with exchange rate type P

Questions: The value calculated by system is not matching with the manual calculation done with exchange rate type P. Any idea what exchange rate type system using to do the valuation? Why the values are different. Also checked with M rate but still system calculated values are not reconciled.

Appreciate your inputs

View Entire Topic
CA_Ram
Participant
0 Kudos

Issue referred to SAP