Hello Experts, 

We have a scenario to map raw material consumption as below for SFG level production order.

1. Raw material length is 6 meters (which is a bought out item, externally procured item from vendor)

2. Actual usage of this raw material is based on FG product and for example if the consumption is 2 meters for a particular FG then the balance 4 meters after consumption has to be posted stock in different material. (Material A = 1 meter & Material B = 3 meters)

3.  We have a requirement to map the scenario via automatic direct consumption and posting of goods (for both raw material consumption and co-product posting)

Please advise. 

Thank you,

kind regards

Thangaraj Thomas

 

 

 

 

Accepted Solutions (0)

Answers (2)

Answers (2)

Corey
Product and Topic Expert
Product and Topic Expert

Hi Thangaraj, You may try to use badi BD_WORKORDER_GOODSMOVT_BKF_GDR. You can use this badi to add or delete components for goods issues or change quantities for goods movement. See online help for the details. https://help.sap.com/docs/SAP_S4HANA_CLOUD/2bba750d1e124e1ea2a039bb1cd9b6c5/c20b8cfa8000468d86a005ec... Best regards, Corey

thangarajthomas
Participant
0 Kudos
Hi Corey, Thank you for your advise. We will check this BadI. Thanks Thangaraj Thomas
Corey
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello Thangaraj,

Thanks for posting this question in Community.
I think that this is the same as the incident we are talking about.
As discussed, I am curious about the situation if the raw material is then performed another partial consumption (e.g. another 2 meters), what would be the expectation of the other 2 materials ? 

Best regards,
Corey