itamar_doprado
Explorer
Member since ‎05-07-2015

User Statistics

  • 11 Posts
  • 0 Solutions
  • 1 Kudos given
  • 0 Kudos received

User Activity

we have a mesure on process ordem with status TECO and day by day is necessary to run a report to analyze the dates of orders that was final confirmed and change status to TECO and comparing the base schedulle dates to real dates final confirmed. ...
I create a routine to a material X by CA01 with sequence 0 (standard) ex: 005,10,20,25,30,40,0050,55,60,70,80,90, 100 etc... and with a sequence alternative 1 that have a start operation (branch) 0040, return operation 0090 and operation 0040, 0049, ...
Hi Guys,Please anybody know how can i solve the following problem:We have a zreport to execute a ATP check on the components of projects CJ20N, but in cases where I execute mass processing in background or in dialogue, this FM  - CO_ZA_AVAIL_CHK_ORDE...
In our process we analyze the MCPS result to have some information system about result production in a certain periodo entry.In this analyze is knowledge that when the orders are complete confirmed or defined status TECO the information of production...
The problem here is that there is no fixed link between the reservation and the receipt element. That means, this information is not stored on any database table, so the only option is it build this relationship dynamically, using data from MD04. If ...