Dear All,
I am creating PR through Z program and use bapi BAPI_REQUISITION_CREATE. The system generates PR successfully. But when I look at item text under "Texts" tab, i found nothing inside the textbox. If I create PR manually using ME51N for the...
Dear All,
I want to create material codes (spares) in mass. For this I have written program that uses BAPI_MATERIAL_SAVEDATA. I am creating Basic, Sales, Purchasing, Plant/Storage, MRP, Accounting and Costing views at a time.
I have gone ...
Hi,
We produce a finished product X in Plant P1. It is managed in batch and is having SLED defined in Material master.
While doing confirmation, user enters Production date and batch B1 for product X. Now, this product is transferred to our diffe...
Dear All,
I am creating maintenance order through IW31. There I am referencing Contract and picking services defined in contract. Now, in service item conditions, I am entering few conditions. So, on saving and releasing maintenance order Service R...
Hi,We have a reservation for material MATX , Qty : 1 Nos.Now in MIGO I issue wrt reservation. Here I change qty to 3 Nos.On pressing CHECK button, System shows message M7-362 as under:"RE Reserved quant. exceeded by 2 NOS : MATX Plant Sloc"I want mes...
Dear Andy.You were right. My problem got resolved. I again revert back to BAPI_PR_CREATE. The problem I found was improper assignment of Update Structure of PRACCOUNTX. I was passing 'X' to PRACCOUNT-Serial_no while populating PRACCOUNTX. ( Copy Past...
Dear Andy,Thanks for advising.I had tried with PRACCOUNT parameter and there I passed everything required including Asset No. But system gives error as "Enter Asset". I tried with many combinations but did not succeed.Regards.Vishram
Hi all,
Is there anyone that has faced same problem ? To let you know, I have improved a little bit. I tried to create material in 2 steps. I succeeded in step 1 but step 2 now gives different error.
Step1) I called BAPI_MATERIAL_SAVEDATA with on...
Hi,
I have done same thing but it gives me error. Following is setting of our material type in SPRO.
We always create material by manually typing material code with this setting.
What am I Missing ?
Below is code I have written.
* If yes ...