former_member303755
Participant
Member since ‎2011 Feb 27

User Statistics

  • 618 Posts
  • 5 Solutions
  • 0 Kudos given
  • 0 Kudos received

User Activity

Hi, We have two FG say FG1 and FG2 and both this FG has common SFG. So we put the order in MD61 at SFG level and when the order of FG are received we consumed SFG in one of the FG whose order was received. So if suppose we consume 50% of SFG in ...
Hi Expert, After MRP run we are getting exception message as 30 with rescheduling date for future requirement. When we run the MRP through MD02 this message goes of and when we run through background this message are seen. Why both are showing ...
Hi Expert, We are facing the problem in S/4 HANA that after MRP run system is not splitting requirement as per the quota defined in MEQ1 between two vendor. If the quota defined is 30/70 between the vendor then after mrp run system is not allocatin...
Hi, We have a requirement were production order is created in first shift (Shift time 7am to 3pm) at 7am for a batch and is closed by 3pm in a shift. During this shift we take 3 sample. One at 9am , other at 12pm and last at 2am. After recordin...
Hi experts, We confirm yield for operation of 20000M through co11n and we want system to purpose GR of header material as 20000M and GI of.component based on this operation yield qty of 20000M. But system is taking base qty of BOM header for calcul...