a_waraich
Explorer
Member since ‎2016 Apr 27

User Statistics

  • 11 Posts
  • 0 Solutions
  • 0 Kudos given
  • 0 Kudos received

User Activity

Hi everybody, I am working on a report where the user wants to have the Project structure from transaction CN41N and besides this some additional information which is not provided in CN41N. Rigth now I am using a BAPI (BAPI_PROJECT_GETINFO) where...
Dear all, I have a customer sales order, where I have assigned a project under account assignment. I am doing a results analysis for the project (POC method) and it shows the plan revenue, which is equal to the sales order value. And I have a sal...
Hi, I have a sales order, where a Results Analysis Key and a Costing sheet is derived from the requirement class/type of the sales order item data. And I also have somehow an Overhead key. I have no idea where this Overhead key is derived from or s...
Hi, I have assigned a costing sheet to a project Profile in customizing. Now when I create a new wbs element in an existing Project, then the costing sheet is automatically available under the control tab, which is good. But for existing wbs elem...
Hi,I am wondering why I have a difference in total amount between table COEJ and COSP.I have selected on both for a specific wbs-element and value type 1 and Version 1.I left the year empty.In COSP I have values for 2014 and 2015.In COEJ I have only ...