Hi everybody,
I am working on a report where the user wants to have the Project structure from transaction CN41N and besides this some additional information which is not provided in CN41N.
Rigth now I am using a BAPI (BAPI_PROJECT_GETINFO) where...
Dear all,
I have a customer sales order, where I have assigned a project under account assignment. I am doing a results analysis for the project (POC method) and it shows the plan revenue, which is equal to the sales order value.
And I have a sal...
Hi,
I have a sales order, where a Results Analysis Key and a Costing sheet is derived from the requirement class/type of the sales order item data. And I also have somehow an Overhead key. I have no idea where this Overhead key is derived from or s...
Hi,
I have assigned a costing sheet to a project Profile in customizing.
Now when I create a new wbs element in an existing Project, then the costing sheet is automatically available under the control tab, which is good. But for existing wbs elem...
Hi,I am wondering why I have a difference in total amount between table COEJ and COSP.I have selected on both for a specific wbs-element and value type 1 and Version 1.I left the year empty.In COSP I have values for 2014 and 2015.In COEJ I have only ...
Hi Mukthar,thank you very much. You are absolutely right.In some cases the cost center was manually added by the users and in other cases with direct postings the cost center came from OKB9.Regards,Afzal
Hi Mukthar,thank you. How do I know, if the order is a statistical order and how do I create a statistical order ?Please find attached a screenshot of the order control and assignment tab.This order is an Investment order, which is settled to an asse...