SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

Parallel meter reading upload via RFC user got TIME_OUT

0 Kudos

Hi,

I got ERROR during MASS meter reading upload (Time limit exceeded.)

In the source code you have the termination point in line 76 of the (Include) program "LEL47U01".

Termination occurred in the ABAP program "SAPLEL47" - in "ISU_DB_ETRG_UPDATE". The main program was "SAPMSSY1 ".

The program "SAPLEL47" has exceeded the maximum permitted runtime without interruption and has therefore been terminated.

Regards,

Mukesh

1 REPLY 1

william_eastman
Advisor
Advisor
0 Kudos

What are your technical parameters? How much data is being uploaded? How is RFC relevant here?