2010 Dec 21 7:15 AM
I am trying to learn the dynamic scheduling. In SPRO setting I have given
o Scheduled MR date to end of the billing period: 3 days
o Interval: scheduled billing date to the end of the billing period: 3 days
o Interval for scheduled bill date: u201C-u201C
In portion end bil per and allocated date bill are same.
Now my sch bill date and sch mr date coming same ...I want some interval between these two dates.
Can anyone tell me how can i do this? If anybody can give me a cookbook or any document on dyn sch, will help me lot.
Thanks in advance.
Godadhar
2013 Feb 21 5:06 PM
Scheduled reading date - end of bill. per should be more than the Interval: sched. bill. date-end bill. per. If you set the scheduled read to be 3 days before the end of bill period, and scheduled bill to be 2 days before end of bill period, then you'll have a 1 day window between scheduled reading and scheduled billing.