cancel
Showing results for 
Search instead for 
Did you mean: 

How to mass upload planned prices (future) in costing 2 view for materials?

Vignesh_Bhatt
Discoverer
0 Kudos

I have a requirement where the business wants to upload planned price (future) in costing 2 view of material master in mass. Are there any standard upload template or t-code available or do we need to upload it via LSMW / BDC? I have checked MM17 and MASS t-codes but planned price field is not available to upload in mass in these t-codes.

Accepted Solutions (0)

Answers (0)