COST CENTER (RESB)

Former Member
0 Kudos
1,211

hi,

I need to know the way to get (specifically the table name that stores) a cost center by activity of the products partially finished (table RESB).

3 REPLIES 3

Former Member
0 Kudos
343

Hello,

I don't know, if I get your point, but the account assignment information for the RESB items can be found in table RKPF (e.g. field RKPF-KOSTL contains the cost center).

Best regards

Stephan

0 Kudos
343

Hi,

Thanks, I actually already looked in the table RKPF , however the field KOSTL is blank in the case we need.

I looked in tables AFVC, CSSK, RESB , however I can't linked them in a query so I can get the same information as the COST calculation in the transaction C203.

Best regards

Grettel

0 Kudos
343

Hello Grettel,

perhaps you can try to go the way, I've proposed Sue in the following thread, to get the database table, SAP uses in transaction C203:

https://forums.sdn.sap.com/click.jspa?searchID=-1&messageID=4672821

Best regards

Stephan