Approval procedure can be used in approve the change request. Now I wan to know if it is possible to use Approval procedure in the project cycle (SMDV). if possible how can we do this? thanks.

Accepted Solutions (1)

Accepted Solutions (1)

former_member187928
Discoverer
0 Kudos

Approval Procedure只能用于SMCR,和SMMN或SMDV无关

详情见:

http://service.sap.com/instguides -> SAP Components -> SAP Solution Manager -> Release 7.1 -> Additional Docments -> ChaRM configuration and upgrade guide -> 3.1.2 Approval Procedure

若approval procedure无法满足你的需求,可考虑采用传统方法,通过user status, action, authorization code来配置approval procedure。详情见:SAP Note 1608118。

Former Member
0 Kudos

我们已经看到了这个文档,但是还是实验了一下! 修改了标准的WEBUI,然后把Approval procedure 分配到了SMDV上。现在已经能够出来approval的section。 还在继续测试。