cancel
Showing results for 
Search instead for 
Did you mean: 

The sequence of moving TR to production

Former Member
0 Kudos

Hi Expert, current the solution is I have appended the structure for 2LIS_11_VAITM and code change in CMOD. now I need to move the TR to production.

I think the sequence will be below,:

1.[R3] LBWE schedule a job to move data from update queue(lbwq) to delta queue (rsa7)

2.[BW] run delta infopackage to load data from r3 delta queue

3.Make sure that both LBWQ and RSA7 is empty (for 2lis_11_vaitm)

4.[R3] move R3 TR to production system.

5.[BW] datasource replication and initialization<?>

6.[BW] move BW TR to production system.

one thing I am not sure is that the datasource initialization should be done before the BW tr transport or after that.

please fell free add your comments. thank you in advance.

Edited by: YAODAN on Jun 18, 2011 6:36 PM

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

If it is 3.x flow then you have to move BW TR before performing Initialization.

If it is 7.0 flow then you can do initialization before or after moving BW TR. It depends on only datasource replication. The mandatory thing is, you have to replicate your Datasoure before initialization.

The other steps in the sequence are perfect.

--- Thanks...

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

If you are looking for historical data for appended new fields, then and only then you need to do re-initialization.

hence you are looking for historical data for newly added fields, you need to do initialization after both transport.

Other than this all steps look fine.. Best luck.

Regards,

Ashish.