on 2012 Feb 09 11:43 AM
Hello,
We have configured SLD bridge between two systems which is PI version 7.0 and Solman 7.1. But the data is not auto transfer,we have configured using this link http://help.sap.com/saphelp_nw70/helpdata/en/43/da21ba13660aa5e10000000a1553f6/content.htm but still no luck.
Are there any options/steps that you can suggest?
Please advise.
Thanks in advance.
Virgilio.
Hi,
1) When you press execute button in RZ70 transaction in ABAP and
press "send data to sld" button in SLD Data Supplier tab in Visual
Admin in J2ee it will update data in both SLD simultaneously if SLD
Bridge working fine between the SLD.
2) By default data is updated in 720 minutes means that the data about
current system will be updated in the SLD twice a day. You can change
it by entering a different value in Minute field in RZ70 Tx.
The most common cause of this problem is that the objectserver name
of both SLD's is the same, (generally the default which is localhost)
Please ensure that each SLD has a unique objectserver name
This can be see in Administration -> Profile -> All
Please also see the following SAP Note:
#[935245|http://service.sap.com/sap/support/notes/935245] - Importance of "Object Server" SLD parameter
If you have
configured this correctly and nothing is being forwarded with no
errors in the logfiles i suspect this is the casue of the problem.
Regards,
Aidan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
66 | |
10 | |
10 | |
10 | |
10 | |
8 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.