Hi Team
Here is our scenario , we have already upgraded SAP EPC component to 3.2 version in SAP PO/NetWeaver SP11 , both directions the data flow was flowing using SAP EPC Primavera API Adaptor.
SAP R/3<-> SAP NetWeaver SP11 <--> Oracle - Primavera P6 (19.20 version).
But when we upgraded to SAP PO/NetWeaver SP27 , we see an issue .
Integration between SAP R/3 and P6 is only working one-way : SAP to P6 is not working , where as P6 to SAP working.
We really don't understand want went wrong?
As per the PAM , we see the SAP PO/NetWeaver SP12 Onwards , EPC connector is supported.
https://support.sap.com/content/dam/launchpad/en_us/pam/pam-essentials/EPC30_PAM.pdf
we wen through couple of notes , but nothing helped us , Connections are showing success , no errors in the NWA logs
2486928 - SAP EPC Primavera P6 EPPM configuration using Primavera P6 EPPM Integration API: setup/settings/troubleshooting - SAP for Me
2297855 - SAP EPC Primavera P6 EPPM Integration: setup/settings/troubleshooting - SAP for Me
Please let us know , what are we missing or done wrong here?
Thanks
Sai