Friends, As part of RISE, with embedded set up [ S/4 ECC, GRC, BW etc ] can only DB refresh of GRC non - production system be performed without refresh of S/4 ECC and BW.
Please let me know.
Thanks
Raj
Hello Raj,
Please check your GRC deployment model as per SAP Note 2229853 - GRC and S/4HANA oP: compatibility information - SAP for Me. Refresh of GRC non-production is possible only in the side-by-side deployment scenarios. If co-deployment/embedded model is used, then S/4HANA and GRC would be on the same database and it is not possible to refresh just the GRC part using standard refresh procedures.