on 2005 Jul 13 11:26 AM
Hi, experts,
out regular process is made change in Development system, then transport to Quality and Production system.
But I alway meet problem in transport Process chain. normally it can transport ot Quality system successfully. but error alway happened within transport to Production system. "Object XXXX has not been imported successfully"
anyone can help me out? thanks a lot
Ho Jie,
Do you have any user-defined event in your process chain which has not been created in Production system.
Also check if all the infopackages,Data targets,etc.. in Quality and Production are same or not.
Bye
Dinesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
no, actually this's just tiny change in process chain.
these is some message for failed import:
R3TRRSPVDBSTAT original object cannot be replaced
Message no. TW103
Diagnosis
An attempt was made to overwrite an original object with an import.
System response
The object is not imported.
Procedure
If you still want to import the object, repeat the import with Unconditional Mode 2.
then I delete Process chain in production system and re-transport it. the error in import said:
R3TRAPCO0ACN was repaired in this system
Message no. TW104
Diagnosis
Object R3TRAPCO0ACN is in repair status. Therefore, it cannot be imported.
System response
The object is not imported.
Procedure
If you still want to import the object, release the relevant repair and repeat the import.
Hi Jie,
The log gives the clear pciture of the problem. I guess, you have done some changes to the Process chain in Target System(QA/Prod whereever ur tranport is failing) directly. After that you are trying to move some changes from Dev. The import of this transport request should be donw with <b><i>'Overwrite Originals'</i></b> option during the import step. Else the import will fail!
Try doing import with that option checked.
Regards,
Sree
Hi Jie/Sree,
Not just Overwite Originals but also the <b><i>Overwrite in Unconfirmed repairs</i></b> also. Thats what I meant by both the options.
Bye
Dinesh.
Message was edited by: Dinesh Lalchand
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Jie,
You can do a retransport of the request. Select both the options for "Overwrite objects". Hopefully the request should move to Production.
PS: For your Info, from the log it is clear that the problem was in one of the Process Variants and also Application Component.
Bye
Dinesh.
Message was edited by: Dinesh Lalchand
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
yes, the log is showed lot of object with error message
"Object XXXX has not been imported successfully"
but it's successful in quality system
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi,
could you go to transport logs and check more detailed error messages there?
Regards,
Andrzej
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
68 | |
9 | |
8 | |
7 | |
7 | |
6 | |
6 | |
6 | |
5 | |
5 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.