cancel
Showing results for 
Search instead for 
Did you mean: 

Original system changed From DEV to SID

Former Member
0 Kudos
133

HI Gurus,

Mistakenly we have done the post installaion activities in SE06 in PRD system. This changed the original system for programs from DEV to PRD. Now we can't able to move any programs into production since those programs original system was DEV so its not replacing this one.

I came to know that we can change the original system in SE03. But not sure which objects has to be changed or which are not to be changed..Please help me how to change this original system. Its very critical. and its very urgent to change this. Please help me in this..

Thanks and regards,

Santhosh Kumar.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

I manually changed all the original system of packages in SE03.