on 2017 Jan 05 10:19 AM
hi,
I have a problem can't solve,thanks for your help.
When preview the sales of a certain period of time ,the model can read the data, but preview the sales of upper segment time of a certain period of time,the model reported the following error , the upper segment time is a new date during the filtering, the new date is pushing interval days before the certain period of time
my hana studio version is 2.3.14
Error: [314]: numeric overflow: search table error: [6944] AttributeEngine: overflow in numeric calculation Proposed Solution: please consider using a data type which supports a larger range
Hi 婷 刘
Please check data type of Calculated attribute / measure you have created; change the data type to accommodate the result; or if its a calculated measure, try type casting the result.
Prasad
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi, Prasad
Thanks for your reply.Maybe I don't have a detailed description.
This model is normal before the HANA version is upgraded from 1.00.091 to 1.00.121,I found this error in the upgraded test.
Once again, the HANA version of 1.00.121 upgrade to 1.00.122, the mode in the Development machine is normal,but error in Production machine.
The following two items are exactly the same.The difference between them is that the sales of daytime.
If the time period of the first project is 20150602 to 20150606, the time of the second project is from 20150529 to 20150602,the time of the second project associated with the first project.
thanks for your help,
婷 刘
User | Count |
---|---|
69 | |
10 | |
8 | |
7 | |
6 | |
6 | |
6 | |
6 | |
5 | |
5 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.