cancel
Showing results for 
Search instead for 
Did you mean: 

Need technical feasibility for IDB

vallamuthu_madheswaran2
Active Contributor
0 Kudos
261

Hi Guys,

Functionally, Creating the BATCH split in VL32N and do the partial GR for BATCH split line item in MIGO.

I need the to do the same technically.

For Example:

  • IBD has 10qty for posnr 5
  • Pass the BATCH split details via IDOC like posnr 900001 qty is 1
  • now creating the BATCH split
  • do the PGR
  • if we goto VL33N, the POSNR 10, qty should be 9 and POSNR 900001 qty should be 1 and Total goods movement status is 'B'.

What FM use in IDOC message type for batch split and How to do the MIGO functionality.

Thanks with Regards,

Vallamuthu M.

Accepted Solutions (0)

Answers (0)