on 2024 Aug 01 4:24 PM
Hello, we have many reports scheduled to run on the 2nd business day of the month. The BO calendar called “Second Business Day” has the correct dates.
The reports are scheduled to run after a System Event (text file is placed into a specific folder).
The problem is, all the reports using the 2nd Business Day calendar with the System Event run a day late. If I run them without the System Event, they run correctly on the 2nd Business Day.
Our daily reports run correctly with a business days calendar and the System Event.
What would cause the monthly reports to run a day late?
The text file is placed into the folder around 4:20am.
The reports are scheduled to run at various times. For example, one report is scheduled to run at 7:30am, but it ran on July 3 instead of July 2.
The reports are webi.
Appreciate any help on this.
Thank you.
Your reports need to be scheduled to run before the file change so the File Event can detect it. If your 7:30 am report were scheduled to run the before the file was placed in the specified location, let's say 4:00 am, the report would run when the file is place there are 4:20 am.
Noel
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
62 | |
9 | |
8 | |
6 | |
6 | |
6 | |
6 | |
6 | |
5 | |
5 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.