Good morning,
how can I cancel a TOE and create a new one in development?
Thanks a lot
Request clarification before answering.
Hello,
You should be able to trigger another Manual Control work item from "Planner" page for the same period as the previous one is already closed and can indicate that this is triggered to retest the control.