on 05-08-2007 3:54 PM
Hi experts,
I have a daily delta running on a LIS extractor. We have made some modifications on the BW side and have therefore done a full repair load from LIS to ODS-A. ODS-A has a running delta load to ODS-B.
My question is: will the documents that I got through the full repair from LIS to ODS-A automatically be a part of delta load from ODS-A to ODS-B?
Kind Regards
Torben
Yes, as long as some fields have changed to generate the delta.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Torben,
sure.
regards
Siggi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
6 | |
6 | |
6 | |
5 | |
5 | |
4 | |
4 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.