LIS: Full repair.

Former Member
0 Kudos
80

Hi experts,

I have a daily delta running on a LIS extractor. We have made some modifications on the BW side and have therefore done a full repair load from LIS to ODS-A. ODS-A has a running delta load to ODS-B.

My question is: will the documents that I got through the full repair from LIS to ODS-A automatically be a part of delta load from ODS-A to ODS-B?

Kind Regards

Torben

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Yes, as long as some fields have changed to generate the delta.

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Torben,

sure.

regards

Siggi