cancel
Showing results for 
Search instead for 
Did you mean: 

JobParameter severity in CPS monitor tree

0 Kudos
118

Hello All ,

Our redwood version is M33.120 . when i went trough monitoring tree the size of JobParameter severity is 50 in Quality and 75 in production for our CPS servers.

we maintain a data of last 1 year . Actually there is no Keep clause value mentioned for each job under job definitions. In order to remove the history of the jobs which are more than 1 year are removed using the below standard jobs which run periodically .

System_RemoveOldJobs

System_RemoveOperatorMessages

System_ArchiveEvents

And additionally by default the system jobs regularly.

I want to know how to decrease the severity of JobParameter where there are high no of rows and delta values. and whats are the steps to be taken care of to decrease the severity.

Accepted Solutions (1)

Accepted Solutions (1)

gmblom
Active Contributor
0 Kudos

Hello,

Go to the Monitor Item and select 'Edit Conditions' and set the limits according to your needs for the different severities.

Regards Gerben

0 Kudos

Hello Gerben,

Thanks for the reply , Are there any more steps to decrease the size of rows and delta values of JobParameter other than deleting history.

Current values looks high

gmblom
Active Contributor
0 Kudos

Hello,

The number of JobParameters is a combination on the number of Jobs you keep in the job table and the number of JobDefinitionParameters you have on your job definitions (for SAP jobs, these are somewhere between 30 and 50). If you don't want to clean up your live job table, try to reduce the number JobDefinitionParameters that are only using default values.

Regards Gerben

Answers (0)