on 2008 Jun 18 4:10 PM
Hey,
I try to configure a netweaver system (aii) and a r3 to communicate with each other.
the aii system did not have the base type matmas01 to receive a material via bd10 from r3 to aii.
I only send a material with a number and that`s it.
I created a basetype in the aii with segment E1MARAM and the fields msgfn, matnr, mbrsh, mtart.
Is this enough?
Then I assigned the Zaidmatmas to this new created base type zmatmas1. I configured in WE20 the parameters for the partner profile and gave him a zmatmas1.
Then I sent a material via BD10, but it does not appear under the producs in my aii. why?
what else should i do to achieve this?
In my R3 I have a status 3 and a green light, but in the aii there never is an incoming idoc. (not even a failure msg, just no connection, although the rfc works properly)
Request clarification before answering.
In my R3 I have a status 3 and a green light, but in the aii there never is an incoming idoc.
Check if u have any entry in sm58 of R3
Regards,
Prateek
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
78 | |
30 | |
10 | |
8 | |
7 | |
7 | |
6 | |
6 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.