on 2023 Sep 27 5:39 AM
Hi,
I have created a calculated measure for SAC planning. Is it possible to write back this calculated measure in the data model? I want this measure in cross-model data action, and apparently we can only use the measures that are present in the data model for cross-model data action. Calculated measures are not appearing in cross-model data action.
Request clarification before answering.
We solved a similar problem by creating a measure similar to the calculated measure in the model to be copied to. The difference was that the original measure was calculated, the one to be copied to not.
So when you run the cross-model-copy you have the measure as "fixed" measure and can use all functions of data actions etc.
Also the calculated measures appear in our cross-model-copy options to be copied from.
BR
Eric
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Eric, facing the same issue. Created a new model and a fixed measure on the second model but when trying to cross model copy either with standard step or using LINK I'm getting an error saying: "Cannot use "XXX" measure since it is calculated or conversion measure". Do you have an example for a code I can use ?
User | Count |
---|---|
78 | |
30 | |
10 | |
8 | |
8 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.