cancel
Showing results for 
Search instead for 
Did you mean: 

How to move a sap note from Test system (note implemented by SP) to Prod system(SP lower level)

former_member80258
Participant
1,970

Hello SAP guys

In our ECC landscape the test systems (Dev and QA) have the same SP level, but the Prod system has a SP levels lower than them, in 3 weeks we'll update SPs of Prod system and so whole ECC landscape will be the same SP levels, all this as part of a planning activity.

The problem we're facing is in Prod system some standard business operation is triggering dumps, those issues can be cleared by a SAP note, but I can't download it from SNOTE in Dev system because these solution is part of a Support Package higher than Prod system.

Directly in Prod system directly I can't to download the SAP note 'cause the client is closed by IT compliance rules

Is there some way to move code/note needed only to Prod system?

Erick Verbena

PROLAMSA

View Entire Topic
Reagan
Product and Topic Expert
Product and Topic Expert

Do you know the objects that will be modified by the SAP note? If yes, I believe you could create a transport of copies in the development system and add those objects to the transport and send it to the production.

former_member80258
Participant
0 Kudos

Hi Benjamin

Thank you for your response.

The ToC doesn't go to prod system. Can be packaged as workbench or customizing transport either?

Regards

Reagan
Product and Topic Expert
Product and Topic Expert

As far as I can remember, if the correction is already in the SP's that were applied on the system then the note will appear as cannot be implemented. If you cannot wait until the SP's are applied on the production then the only options are:

1 - Copy the existing production to a sandbox system and manually modify the objects in the sandbox and move the transport to the production.

2 - Create a TOC and add those objects that are modified by the note and move it to production.

I don't understand why you cannot move a TOC to production.