cancel
Showing results for 
Search instead for 
Did you mean: 

How to move a sap note from Test system (note implemented by SP) to Prod system(SP lower level)

former_member80258
Participant
1,979

Hello SAP guys

In our ECC landscape the test systems (Dev and QA) have the same SP level, but the Prod system has a SP levels lower than them, in 3 weeks we'll update SPs of Prod system and so whole ECC landscape will be the same SP levels, all this as part of a planning activity.

The problem we're facing is in Prod system some standard business operation is triggering dumps, those issues can be cleared by a SAP note, but I can't download it from SNOTE in Dev system because these solution is part of a Support Package higher than Prod system.

Directly in Prod system directly I can't to download the SAP note 'cause the client is closed by IT compliance rules

Is there some way to move code/note needed only to Prod system?

Erick Verbena

PROLAMSA

View Entire Topic
former_member602690
Active Participant
0 Kudos

Dear Erick,

Great question.

1. Look at the program(s)/object(s) to be changed by your SAP note. Does those program(s)/object(s) exist in the same exact version# in your SAP Prod system? Same exact version#s in your SAP DEV system? Same exact version# as your QA system? Look at the code changes suggested in SAP note, inspect the same code in your SAP DEV, QA and PRD systems? Are they all the same exact code in each SAP DEV, QA, PRD, & SAO note "before" change?

If yes, then you can apply this note in SAP DEV, test, transport to QA, test, transport to PRD, run it.

If not:

You're right, you would not download SAP note directly in Prod system (closed by IT compliance rules).

You cannot move notes directly to PRD (not skip DEV, QA).

Can you:

1. download SAP note into DEV, test (did it fix problem in DEV?), transport note to QA, test, also simultaneously:

2. expedite your DEV SP testing, transport to QA, then QA SP testing, gain your management approval to update SPs into PRD soon?

In your ECC landscape, it's best if your Production (PRD) system has same Support Pack (SP) level as your test systems (Dev and QA). Since in 3 weeks, you'll update SPs of Prod system, your whole ECC landscape will have the same SP level.

Let me know.

Sincerely,

joanna couto

former_member80258
Participant

Hi Joanna

Firstly thank you for your time. Let me do some activities and I'll back to you to inform

You gave me some highlights...!

Regards and nice weekend

former_member602690
Active Participant
0 Kudos

Hi Erick,

Happy Holidays! How are things going? Did you get a chance to review your situation yet? Thanks and have a great holiday!

joanna