We have the problem, that the costing considers the assembly scrap which we don't want to be included.

Is there a way to eliminate the assembly scrap only within the costing via customizing, user-exit or modification?

We would be pleased, if someone could give us a hint for a solution.

Thank you

Ignaz

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

To use a user exit in validations, you have to perform following steps;

- copy SAP standard program GGBS002 to ZGGBS002

- create a user exit in this program (such as U902, U903 etc)

- the user exit you defined in the above mentioned program will be visible in validations on screen tab 'Exits'

- configure your validation with 'User exit' as option

This can help u.But see this is not the right place to post.You need to post in a different forum.

PS:If this helps you please award Points.

Regards,

Raja Akella.

Former Member
0 Kudos

Hello Mr. Akella,

unfortunatly I can't find the program you mentioned in your answer, so your answer was not very helpful for me.

As I'm very new in SDN, I'm not sure which forum would be the right one. So please could you give me a suggestion.

Anyway thank you for trying to help me.

best regards

Ignaz