Field BUDAT in 2LIS_02_ITM

Former Member
0 Kudos

Hi,

In the specification for field BUDAT it says that this is the Posting date of Goods Receipt or Invoice Receipt for the PO.

But when both GR and IR are done, we want both dates to be listed. Ex: GR posting date 01.07.2007, IR posting date 05.07.2007. Only the date 05.07.2007 is being listed in our DSO. What can we do to get both dates listed?

Thanks!

BR,

Linda

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

If your datasource is providing you both the fields then just add respective infoobject in your DSO and maintain the proper mapping for the same in infosource and rules/transformation and you shall be fine.

Sameer

Former Member
0 Kudos

Hi,

There is only one field in my datasource, BUDAT. I'm not sure how this field can either be posting date for GR or posting date for IR. What happens if there is both GR and IR on the same PO? The field can not contain two values at the same time.

BR,

Linda

Former Member
0 Kudos

You can get two lines in DSO in case GR and IR both have posting dates. ie. same document number can be repeated

Former Member
0 Kudos

Hi Linda,

You can have the following option: Update 2 DSO's, one with just GR information, including the date, and other DSO with just IR information. You can do it using the Process Keys. The update both DSO's to a single DSO. You'll have both dates in two different Infoobjects.

Assign points if helps.

Regrads,

Nuno

Former Member
0 Kudos

This won't work well for delta for very high volume.

Sameer