Former Member
0 Kudos

I have ran a delta load in BW which I am awaiting to complete. However, can I make an R3 change to a document whilst this load is running and thereafter carry out a BW delta load? Thanks

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Nitin

Yes you could do changes in R/3 and those changes will pick up In the next Delta.

Hope this helps

Thnaks

Sat

Former Member
0 Kudos

Thanks for that, do I need to wait for the BW init to finish before I run the BW delta, or can I run the delta. Also since the delta is only 1 record will it be returned before the BW init is finished or after?

Former Member
0 Kudos

Niten

In order to run delta you have to wait till INIT Load Complets.

Please reward the answer if it helps

Thnaks

Sat

Former Member
0 Kudos

Thanks for that Sat