on 2010 Jun 08 3:01 PM
Hi
Can " Availability Time Planning " be used to schedule polling at two different times. I mean I want it to poll two times a week, on two different days. On monday and friday. So can a single communication channel be configured to poll twice in a single week or do we need two CC to do this.
Ajith
Configure the ATP as Weekly and then select the required days of the week (Monday and Friday)....no need of two channels.
Regards,
Abhishek.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.