BW 3.1 migration to 7.0

Former Member
0 Kudos

Is it possible to upgrade BW 3.1 directly to BW 7.0(without passing to the intermediate stage of BW 3.5)

I will really appreciate if you can elaborate about the procedure.

Thanks

Vinay

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

check this thread that deals with 3.0 migration to 7.0

Message was edited by:

voodi

Answers (3)

Answers (3)

Former Member
0 Kudos

Many Thaks Voodi, Naga, Chetan. These answers have made the things crystal clear for me regarding the *concept*.

Can anybody please tell if there exist some concrete estimation guidelines for a migration project from BW 3.1 to 7.0. Questions like

1) Is it the database size or the BW complexity(in terms of number of infoproviders or the management rules) that need to be taken as a baseline.

2) Are there specific functional(FI, CO, MM) or business areas(banking, assurance, manufacturing) that give a problem - some real life migration project experiences.

3) An optimum size of such migration project in terms of personnel and duration e.g 5 consultants for 4 months and stuff

4) The possible down time for the customer(ideal and worst case scenarios)

I have not worked on BW 7.0 and hence unable to envisage the above situations.

Thannks in advance

Vinay

Former Member
0 Kudos

answer is YES from BW 3.1 to BI 7.0 but the same should have SP11 and higher.

for more insights like master guide and planning check below -

https://websmp110.sap-ag.de/upgradeNW70

Hope it Helps

Chetan

@CP..

Former Member
0 Kudos

Hi Chetan,

Any idea about the specific limitation between

SAP BW 3.X without support package 11 and BW 3.X updated with this SP

regards,

Vinay