cancel
Showing results for 
Search instead for 
Did you mean: 

Background Job

Former Member
0 Kudos
216

Hi

System configuration

=====================

SAP R/3 Enterprise 4.7

Max DB

Linux

We are having some issues with background jobs. The QA system was refreshed from the PRD system last week. After this we are not able to execute background jobs.

What happens is that when we try to execute the background job, it goes to released from scheduled and after that it cancels itself off (after few minutes)

We have confirmed that there are sufficient background processes available. The user who is executing this sufficient priviledges for the same.

best regards

Ravi

PS: Please find enclosed the screenshot of the error

http://download.yousendit.com/183DC81F5D090D38

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

Check the filesystem full.

/usr/sap/...

Regards

Ben

Former Member
0 Kudos

Hi Ravi,

Please go to transaction RZ12 and let me know the contents of it.

regards.

Ruchit.

Former Member
0 Kudos

Hi

Please find enclosed the snapshot of RZ12

best regards

Ravi

http://download.yousendit.com/4523CEB40F810EFA

Former Member
0 Kudos

Hello Ravi,

I thin ZPD is zour production system and ZID is your quality system however in your QAS system parallel generators is assigned value for production. That might be because of system copy.

In QAS go to RZ12 and change the instance for parallel generators to cizid02_zid_02 and save the changes. After this please try to run the job again. I should solve the issue. Also I would recommend one thing. Give the values under the section determinition of resources. Just check if there are any values mentioned under rfc group that is blank. If there are simply copy them.

Please award points if issue got solved.

Thanks and Regards.

Ruchit.