on 2022 Jan 07 5:43 AM
Hello All,
I have a question regarding the additional production system functionality in ChaRM (https://launchpad.support.sap.com/#/notes/2882691). In this SAP note it is described that the systems that are not in the task list can be selected as "additional production system", however it is not described specifically what systems can appear in the dropdown of this section. Currently the system that i'm trying to add is not visible in this dropdown, without this information i'm unable to proceed with the configuration.
Alternatively I'd appreciate if you could suggest how I should setup a second production system where transports can be imported AFTER the 1st prod system (so not parallel).
Hello,
Is the additional production system you mention added to any solution? Is it visible in LMDB? What sort of system role do these systems have in the logical component? I think that, in order to be able to add the system to a task list , it has to be defined in some capacity in a logical component / logical component group / solution .
Best regards,
Miguel Ariño
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
73 | |
10 | |
9 | |
8 | |
8 | |
6 | |
6 | |
6 | |
5 | |
5 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.