cancel
Showing results for 
Search instead for 
Did you mean: 

2LIS_02_SCL is missing goods received qtys when coming into BW

Former Member
0 Kudos

We have a scenario . We have the follow the sequence of schedule lines scl 1, scl2 and scl3. If scl1 and scl2 are delivered, then scl3 is changed to go before scl2, the material doc is switched to scl3 in the SCL extractor. The SCL extractor never picks up the goods receipt for scl 2 so we are missing a goods received for scl2.

Accepted Solutions (0)

Answers (1)

Answers (1)

jagadeesh_mandepudi2
Active Contributor
0 Kudos

Hi

This is facing in test system or production system, if it is production system then chek with fresh data load including setup tables.

Regards

Jagadeesh

Former Member
0 Kudos

In all systems we see it and we can replicate it.

Former Member
0 Kudos

another interesting thing that is occurring is most of the kefy figures when loaidn to the DSO are off by a factor of 1000. In the PSA they are correct though