Simple? Now! Register and join us for three days of strategy, networking, interactive discussions, and education on the latest SAP applications and services to help simplify your organization. SAPPHIRE NOW 2015 takes place May 5 – 7, 2015 in Orlando, Florida.
Everyone is talking about Run Simple and SAP S/4HANA. Learn more about it and visit us at our pod Simplify Your Move to the Cloud and SAP S/4HANA (Demo Station at booth SC514) in the Service & Support Campus at the show floor.
Get first hand expertise in S/4 HANA and how to migrate to this new solution.
Get ready to talk SAP S/4HANA at this year's event.
Why else should you visit SAPPHIRE NOW 2015? Attend to learn and network with peers and SAP experts. See the latest innovations to address your technology challenges and increase your productivity. Join discussion groups, watch demos, participate in microforum discussions and test drive the latest application technologies.
Our special this year: Migrate to HANA – perform DB migrations like an expert with a downtime optimized approach. Visit this lecture and learn how to leverage the new downtime optimized approach that realizes the database migration in minimal time! This does not only save a lot of time and money, it also makes use of the most sophisticated tools around SUM, SWPM and DMO. Don't know these acronyms? Become a database migration insider and learn the rapid way for facing the challenge of migrating your SAP ERP to SAP HANA.
With our downtime-optimized approach, we can migrate data while productive systems are still up and running. Approximately 90% of a customer’s source system are initially transferred. We are ensuring stability and consistency of the running system by tracking all delta information during the first migration step. This means that the system has to be shut down only while we migrate the delta - which brings downtime to a minimum.
Register now and add session BT1614 to your agenda!
Follow us on Twitter: @SAPServices
1: EhP Update is mandatory/included in “Scenario 1: EhP Update and Migration with Database Migration Option (DMO) tool” and optional in “Scenario 2: EhP Update and Migration with SUM and SWPM”
2: PRE-PROD system is optional
3: Unicode Conversion and/or Migration to integrated SAP SCM liveCache and/or Downtime Optimized DMO Approach are optional
4: The Unicode conversion can be done during the migration to SAP HANA with DMO only if SAP SCM liveCache is not used. In case you are using SAP SCM liveCache and your system is a non-Unicode system, use Scenario 2 (SUM and SWPM)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
25 | |
13 | |
13 | |
12 | |
10 | |
9 | |
9 | |
8 | |
6 | |
6 |