cancel
Showing results for 
Search instead for 
Did you mean: 

Proposed Strategy in /sapapo/rrp3

Former Member
0 Kudos

Dear experts,

I want to know that how the value for 'Proposed Strategy' is populated for a product-location combination in /sapapo/rrp3 under 'Demand' tab.

Is there any link of 'Proposed Strategy' in APO with 'Strategy Group' in MRP3 tab of material master in R/3 through configuration or by any other way?

Regards,

Sagar Irabatti.

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member187488
Active Contributor
0 Kudos

Hello, I suppose you are asking the field in /sapapo/mat1.

Generally it is CIFed from ECC if you did not set it by yourself.

The corresponding field in ECC is is strategy group -> Main Strategy on MRP3 tab in MM02/MM03.

A general conversion is like:

R/3   APO

10     10

20

40     20

50     30

60     40

70     20

Best Regards/Ada

Former Member
0 Kudos

Hi,

Thanks for the reply.

Can you please tell where the conversion of strategies from R/3 to APO is maintained?

In my case, I have following strategies in APO which I am not able to find in the strategies of R/3:

35PLANNING W/O FINAL ASSEMBLY FOR CONFIG.
40PLANNING PRODUCT
50VMI PLANNING (ICH)
former_member187488
Active Contributor
0 Kudos

Hi, the conversion is done by system, no customizing setting to control it.

SAP provides the following strategies in the standard system:
Make-to-stock (strategy 10)

Forecasting with assembly (strategy 20)

Forecasting without assembly (strategey 30)

Forecasting without assembly for configurable products (strategy 35)

Planning product (strategy 40)

planning strategy defined in the ECC material master is transferred to the APO product master using the CIF. Note that the logic differs in the two systems (even the numbers that indicate the strategy in ECC and APO are not usually identical because several ECC planning strategies can often be mapped with one requirements strategy in APO).

You can also change the strategy in APO if you want.