cancel
Showing results for 
Search instead for 
Did you mean: 

Product Master - APO

Former Member
0 Kudos

Hi ,

Work-scheduling View of Material master is having field called " Prodn Controller " which can be seen at APO Product master level in product master overview tab as Prodn planner above SNP planner . Work Scheduling View in SAP R/3 is maintained generally if Materila is In - House manufactured ( type E) now when we CIF Material with External procurement is this field mandatory to maintain for Externally procured materials too ? If not how this settign can be done to aviod to maintain work scheduling view in R/3 for Externally procured material still CIF materila master to APO as product master ?

Thanking You

Ratnakar Pawar.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

No need to maintain Work scheduling view for external procured items. The value of MRP controller field in MRP1 view will be the Production Planner value in APO

Hope u r clear now

regards

Vijay

Former Member
0 Kudos

Hey Vijay ,

Thanks for the reply I got the major part of my Q answered really thx. Can you add on to your answer and tell me where I can setup MRP controller of SAP R/3 too go into prodn planner of APO product master how that setting is done bcoz our current setting is to CIF work scheduling to APO so if you can tell me more about setting then it will be really help ful

Thanks alot for your answer .

Ratnakar Pawar.

Former Member
0 Kudos

Hi

If you have maintained MRP views in your material master and when cif a material having maintained then it will get transferred to APO system. No additional settings reqd

Hope u r clear now

regards

Vijay

Answers (0)