on 2024 Aug 20 10:42 AM
Hi,
supplier sends single material as multiple items in a delviery, and later those multiple items are posted in MIGO. The problem is realted to SKIP Inspection lots.
QM inspection lot origin 01 is active. In insp type setup field "Control InsLot" I can select:
"For each material document item" - standard setup that will create multiple inspection lots, not what I want. Good thing is that for SKIP lots, it is posted to unrestricted stock directly.
"1 For each material document, material, batch and storage location" - that creates one inspection lot, which is what I wanted, but my problem is that for SKIP lots material is posted to Q stock.
due to QM and WM intefrace setup I don't want to post SKIP lots to Q stock but this is SAP's standard:
https://me.sap.com/notes/0002077450
How can I ovecome this ? To have "1 For each material document, material, batch and storage location" but post to unrestricted.
Request clarification before answering.
To make sure SKIP lots go to unrestricted stock while using "1 For each material document, material, batch, and storage location" for inspection lot creation, you can try these steps:
1. Adjust your **QM inspection type** settings to handle SKIP lots differently.
2. Update the **QM-IM interface** so SKIP lots are posted to unrestricted stock.
3. Use a **BAdI** to control the stock posting specifically for SKIP lots.
4. Modify the **MIGO** logic to prevent SKIP lots from going to Q stock.
5. If needed, create a custom solution to automatically route SKIP lots to unrestricted stock.
This way, you can keep your inspection lot setup intact while ensuring SKIP lots post where you want them.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
9 | |
4 | |
4 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.